HORNET INFOTECH/FIELD RECORD / 07/BMS & AUTOMATION
CLASSIFICATION: ARCHIVE DISCIPLINE
BUILDING SYSTEMS • FACILITY CONTROL ARCHITECTURE

BUILDING SYSTEMS.
WORKING TOGETHER.

A field archive for building management, automation, monitoring and facility-system integration across commercial, institutional, industrial and mission-critical environments.

The focus of this archive is on the physical and engineering infrastructure required to connect, interface and supervise building systems across electrical, mechanical, life-safety, security, and environmental layers.

ARCHIVE DISCIPLINE
DISCIPLINE SPECIFICATION
DISCIPLINEBMS & AUTOMATION
INTEGRATION SCOPEELV / ICT / Controls Layer
VISUAL STATUSREFERENCE ARCHIVE
PUBLICATION STATUSCONTROLLED (NDA PROTOCOL)
CANONICAL REPOALL_PROJECTS = []
Representative visual reference — not a documented HORNET project.
ARCHITECTURAL REFERENCE PLATE • BUILDING OPERATIONS & CONTROLS FACILITY
Representative visual reference — not a documented HORNET project.
SECTION 02 • INTEGRATION PHILOSOPHY

THE BUILDING BECOMES THE SYSTEM

Modern commercial, institutional, and industrial facilities no longer function as isolated mechanical or electrical silos. Instead, modern architecture encompasses numerous specialized systems that require coordinated monitoring, structured telemetry indication, and controlled operational visibility across day-to-day operations.

From HVAC plant status and electrical sub-metering to life-safety damper monitoring, access events, and environmental thresholds in mission-critical rooms, the facility operates most effectively when engineering interfaces allow disparate building elements to communicate through structured supervisory channels.

ENGINEERING BOUNDARY & INTEGRATION MANDATE

HORNET INFOTECH specializes in the ELV / ICT / controls / monitoring / integration layer within defined project specifications. HORNET does not independently design or engineer complete HVAC systems, mechanical chillers, electrical power generation, structural engineering, or general plumbing architecture unless specifically documented in a future verified project record.

Building Management Systems (BMS) in HORNET's field discipline establish the structured communication backbone, direct digital control (DDC) panel terminations, sensor networks, protocol translation gateways, and central workstation visualization that enable facility engineers to supervise complex environments with precision.

CONNECTED BUILDING ELEMENTS10 CORE INTERFACES
HVAC / Plant InterfacesPH-01
Chiller run status, VAV, fan coils, air handling units
Electrical MonitoringPH-02
Energy sub-meters, main panel breaker status, UPS power telemetry
Lighting Control InterfacesPH-03
Scheduled scenes, common area lighting relays, DALI integration
Fire Alarm InterfacesPH-04
System event status, smoke damper positions, evacuation relays
Security & Access InterfacesPH-05
Door forced alarms, barrier telemetry, perimeter event flags
Environmental SensorsPH-06
Room temperature, relative humidity, air quality sensors
Critical Room Water Leak (WLD)PH-07
Linear sensing cable status, localized zone alarm relays
Pump & Tank MonitoringPH-08
Hydro-pneumatic pump trip status, water reservoir level switches
Facility Alarm RegistersPH-09
Centralized annunciation, historical event logs, operator logs
Supervisory WorkstationsPH-10
Graphical system schematics, floor plan views, equipment registers
INTERFACE STANDARDAS SPECIFIED BY PROJECT
SECTION 03 • ARCHIVAL TAXONOMY

AUTOMATION REGISTER

Eight primary functional domains within HORNET building management and automation integration scope.
01REG

FACILITY MONITORING

Centralized visibility of connected facility systems where required.

Establishes high-reliability telemetry collection across primary building infrastructure, aggregating discrete equipment contacts, analog sensor voltages, and serial communications into a synchronized supervisory framework.

TYPICAL INTERFACES
  • Equipment Status Contacts
  • Dry Contacts & Digital Relays
  • Analog 0-10V / 4-20mA Loops
02REG

BMS INTEGRATION

Interface and integration of building systems within defined project scope.

Configures microprocessor-based Direct Digital Controllers (DDC), modular I/O expansion racks, and field bus segments to coordinate multi-discipline building subsystems into a single operational architecture.

TYPICAL INTERFACES
  • Microprocessor DDC Units
  • Field Bus Segments
  • Protocol Translation Gateways
03REG

ELECTRICAL MONITORING

Monitoring interfaces for electrical systems where specified.

Provides continuous electrical parameter visibility by interfacing digital power sub-meters, main switchboard status contacts, UPS battery health telemetry, and automatic transfer switch (ATS) positions where required.

TYPICAL INTERFACES
  • Digital Multi-Function Energy Meters
  • Main Panel Breaker Auxiliary Contacts
  • UPS System Serial / SNMP Telemetry
04REG

MECHANICAL SYSTEM INTERFACES

Integration with selected mechanical systems where required by project design.

Interlinks chiller management panels, air handling units (AHUs), variable air volume (VAV) controllers, and fan coil units through standardized communication protocols to monitor operational states and alarm thresholds.

TYPICAL INTERFACES
  • Chiller Plant Gateway Interfaces
  • AHU Fan Run/Trip Status
  • VAV Actuator Position Telemetry
05REG

SECURITY INTEGRATION

Security and access events presented through facility monitoring where supported.

Interfaces physical access control controllers and perimeter intrusion alarms with central facility management, displaying forced-entry events, emergency door unlock states, and barrier positions on facility floor plans.

TYPICAL INTERFACES
  • Access Controller Event Gateways
  • Emergency Break-Glass Monitored Contacts
  • Turnstile & Barrier Status Relays
06REG

FIRE / LIFE-SAFETY INTERFACES

Fire alarm status and related interfaces according to approved cause-and-effect design.

Integrates dry-contact event triggers and supervised relays with main Fire Alarm Control Panels (FACP) to track zone alarm locations, trigger life-safety damper positions, and initiate HVAC shutdown in strict accordance with approved life-safety matrices.

TYPICAL INTERFACES
  • Supervised FACP Alarm Contacts
  • Fire Damper Limit Switch Monitoring
  • Smoke Evacuation System Interlocks
07REG

ENVIRONMENTAL MONITORING

Temperature, humidity, water leak and other environmental monitoring where specified.

Monitors ambient atmospheric variables and liquid intrusion in sensitive operations zones, including server rooms, electrical substations, archives, and UPS battery enclosures via high-accuracy sensing hardware.

TYPICAL INTERFACES
  • Dual Temp/RH Electronic Transmitters
  • Linear Water Leak Detection Cables
  • Precision Differential Pressure Sensors
08REG

CENTRAL SUPERVISION

Unified facility visibility where the project requires centralized supervision.

Delivers high-clarity graphical human-machine interface (HMI) workstations, multi-screen facility operations console layouts, alarm prioritization engines, and auditable event logging for building engineering personnel.

TYPICAL INTERFACES
  • Graphical Dynamic HMI Workstations
  • Alarm Priority Management Console
  • Historical Chronological Event Logging
SECTION 04 • DOCUMENTARY EVIDENCE

REPRESENTATIVE FIELD PLATES

Architectural & engineering reference photography representing physical BMS panels, control environments, and facility interfaces.
Representative visual reference — not a documented HORNET project.
FIELD PLATE 01
REPRESENTATIVE REFERENCE
CENTRALIZED FACILITY MONITORING & OPERATOR WORKSTATION

BUILDING OPERATIONS CENTRE

Architectural building operations environment configured with multi-screen supervisory workstations, facility alert consoles, and centralized system overview displays.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
Representative visual reference — not a documented HORNET project.
FIELD PLATE 02
REPRESENTATIVE REFERENCE
UNIFIED MONITORING CONSOLE & SYSTEM STATUS INTERFACES

BMS / FACILITY CONTROL ROOM

Technical control room installation integrating status telemetry from connected facility subsystems, network supervisory servers, and operator response terminals.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
Representative visual reference — not a documented HORNET project.
FIELD PLATE 03
REPRESENTATIVE REFERENCE
DIRECT DIGITAL CONTROL (DDC) PANEL & SENSOR TERMINATION

MECHANICAL PLANT INTERFACE

Enclosed industrial DDC automation panel housing microprocessor controllers, analog/digital I/O modules, 24V DC power distribution, and communication interface gateways.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
Representative visual reference — not a documented HORNET project.
FIELD PLATE 04
REPRESENTATIVE REFERENCE
SUB-METERING INTEGRATION & POWER DISTRIBUTION MONITORING

ELECTRICAL / POWER MONITORING

Electrical room monitoring interfaces linking digital energy meters, breaker auxiliary status contacts, and power distribution telemetry over serial/IP communication networks.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
Representative visual reference — not a documented HORNET project.
FIELD PLATE 05
REPRESENTATIVE REFERENCE
TEMPERATURE, HUMIDITY & LEAK DETECTION SENSOR ARRAYS

CRITICAL ROOM ENVIRONMENTAL MONITORING

High-density sensor integration across server and hub rooms tracking ambient temperature, humidity thresholds, sensing-cable water detection, and room status relays.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
Representative visual reference — not a documented HORNET project.
FIELD PLATE 06
REPRESENTATIVE REFERENCE
FACILITY-WIDE SYSTEM CONVERGENCE & COORDINATION LAYER

INTEGRATED FACILITY SUPERVISION

Commercial facility architecture showing spatial distribution of connected building subsystems coordinated through a structured ELV/ICT monitoring and automation backhaul.

STATUS: REFERENCE RECORDNOT A DOCUMENTED HORNET PROJECT
SECTION 05 • DELIVERY LIFECYCLE

ENGINEERING SCOPE & DELIVERY MATRIX

AS REQUIRED BY PROJECT DESIGN

HORNET follows a disciplined lifecycle framework for BMS and automation integration. The specific stages deployed depend entirely upon the approved project engineering scope, MEP coordination, and client operational requirements.

ST-01PHASE

SITE SURVEY

Physical audit of plant rooms, risers, panel locations, and cable path availability.

WHERE SPECIFIED
ST-02PHASE

SYSTEM REQUIREMENTS

Identification of monitoring points, operator workstations, and integration standards.

WHERE SPECIFIED
ST-03PHASE

POINT / SIGNAL MAPPING

Preparation of comprehensive hardware and software input/output (I/O) schedules.

WHERE SPECIFIED
ST-04PHASE

INTERFACE DEFINITION

Coordination of communication boundaries with mechanical, electrical, and life-safety OEMs.

WHERE SPECIFIED
ST-05PHASE

CONTROL ARCHITECTURE

Design of field bus segments, supervisory network topologies, and server redundancy.

WHERE SPECIFIED
ST-06PHASE

NETWORK COORDINATION

VLAN allocation, IP addressing schemas, and protocol gateway routing coordination.

WHERE SPECIFIED
ST-07PHASE

PANEL INSTALLATION

Assembly, wiring, terminal labeling, and physical mounting of DDC automation enclosures.

WHERE SPECIFIED
ST-08PHASE

FIELD SENSOR INTEGRATION

Mounting and termination of temperature, humidity, pressure, and flow transducers.

WHERE SPECIFIED
ST-09PHASE

SYSTEM CONFIGURATION

Programming of DDC control loops, alarm threshold triggers, and timing sequences.

WHERE SPECIFIED
ST-10PHASE

GRAPHICS / INTERFACE

Drafting dynamic facility floor plans, plant schematics, and equipment popups.

WHERE SPECIFIED
ST-11PHASE

INTEGRATION TESTING

Multi-system verification confirming signal integrity across third-party equipment gateways.

WHERE SPECIFIED
ST-12PHASE

TESTING & COMMISSIONING

End-to-end point-to-point loop checks, sensor calibration, and sequence simulation.

WHERE SPECIFIED
ST-13PHASE

DOCUMENTATION & HANDOVER

Delivery of as-built single lines, cause-and-effect sheets, and operations manuals.

WHERE SPECIFIED
ST-14PHASE

AMC / LIFECYCLE SUPPORT

Periodic sensor calibration, software backups, and preventative controller audits.

WHERE SPECIFIED
SECTION 06 • INTEGRATED ARCHITECTURE

SYSTEM CONVERGENCE SCHEMATIC

Directional signal routing and supervisory visibility mapping across facility systems.
CENTRAL SUPERVISORY APEX

FACILITY SUPERVISION & BMS CORE

Centralized operator console, supervisory servers, historical event registers, and dynamic visual building graphics.

• UNIFIED VISIBILITY• ALARM ANNUNCIATION• AUDIT TRAILS
SUB-01PROJECT-SPECIFIC

MECHANICAL / HVAC

Chillers, AHUs, VAVs & Fans

SIGNAL FLOW
Plant Interface → Gateway → Telemetry → Operator View
SUB-02WHERE REQUIRED

ELECTRICAL MONITORING

Sub-meters, Breakers, UPS Telemetry

SIGNAL FLOW
Digital Meter → Modbus/IP → Power Dashboard → Log
SUB-03PROJECT-SPECIFIC

SECURITY & ACCESS

Door forced, Reader alerts, Gates

SIGNAL FLOW
Controller Relay → Event Interface → Facility Flag
SUB-04WHERE SPECIFIED

FIRE / LIFE SAFETY

FACP Alarm state, Damper relays

SIGNAL FLOW
FACP Relay → Monitored Event → Supervisory Indication
SUB-05WHERE REQUIRED

ENVIRONMENTAL SENSORS

Temp, Humidity, DP transmitters

SIGNAL FLOW
Analog Sensor → DDC Input → Range Check → Alert
SUB-06PROJECT-SPECIFIC

WATER LEAK DETECTION

Linear sensing cables, Critical rooms

SIGNAL FLOW
Cable Resistance → WLD Panel → Alarm Relay → Response
SUB-07WHERE REQUIRED

CRITICAL ROOM PROTECTION

Server rooms, Hub rooms, Electrical LT

SIGNAL FLOW
Room Sensor → Local DDC → Remote Annunciation
SUB-08WHERE SPECIFIED

NETWORK INFRASTRUCTURE

Managed switches, Fibre backbone, VLANs

SIGNAL FLOW
Field Bus → Ethernet Core → Server Host → Client Console
DIRECTIONAL INTEGRATION RELATIONSHIPS • EXPLICIT PROTOCOL QUALIFIERS
FIRE ALARM INTEGRATION (PROJECT-SPECIFIC)
Fire Alarm → Facility Event Contact → Supervisory Indication → Operator Response.Important: Life-safety action execution resides within approved FACP logic; BMS provides supervisory reflection where specified.
SECURITY & ACCESS INTEGRATION (WHERE REQUIRED)
Security Event → Monitoring Interface → Facility Supervision Flag → Guard Response.Presents verified door state anomalies and barrier alarms on primary facility console layouts.
WATER LEAK DETECTION (WHERE REQUIRED)
Water Leak → Local Cable Resistance Detection → Monitoring Alert → Maintenance Dispatch.Enables rapid localization of liquid breach in critical raised floor or hub room voids.
ELECTRICAL STATUS MONITORING (PROJECT-SPECIFIC)
Power Status → Digital Monitoring Interface → Facility Visibility → Engineering Log.Aggregates breaker auxiliary positions, voltage phase balance, and generator transfer state.
SECTION 07 • SPATIAL REGISTER

ARCHITECTURAL FACILITY ZONES

Spatial allocation of monitored building systems and typical field interface requirements.
ZONE 01

MAIN BUILDING / FACILITY AREAS

Primary commercial or institutional occupancies and public circulation corridors.

MONITORED SYSTEMS

Floor temperatures, ambient humidity, common area lighting relays, life-safety damper positions.

TYPICAL INTERFACES

Network DDC field panels, motorized damper switches, ambient space temp transmitters.

OPERATIONAL PURPOSE

Provide baseline environmental stability and emergency life-safety damper coordination.

ZONE 02

PLANT / MECHANICAL ROOMS

Centralized plant locations hosting primary chillers, pumps, boilers, and AHUs.

MONITORED SYSTEMS

Chiller run/trip status, condenser pump differential pressure, supply air temperature, water flow.

TYPICAL INTERFACES

Industrial DDC automation cabinets, immersion temperature thermowells, DP switches, analog valves.

OPERATIONAL PURPOSE

Ensure centralized engineering visibility of primary thermal generation and distribution plant.

ZONE 03

ELECTRICAL ROOMS

Main low-tension (LT) and medium-tension (MT) distribution rooms and capacitor banks.

MONITORED SYSTEMS

Digital energy sub-meters, main air circuit breaker (ACB) trip contacts, transformer room temp.

TYPICAL INTERFACES

RS-485 Modbus serial loops, digital multi-function meters, dry-contact auxiliary inputs.

OPERATIONAL PURPOSE

Track power continuity, phase loading balance, and electrical switchgear operating status.

ZONE 04

SERVER / NETWORK ROOMS

MDF, IDF, and telecommunications distributor enclosures across building floors.

MONITORED SYSTEMS

Precision air conditioning (PAC) run state, ambient temperature, humidity, water leak detection.

TYPICAL INTERFACES

High-accuracy dual sensors, spot/rope water leak detection controllers, door contact switches.

OPERATIONAL PURPOSE

Protect high-density ICT switching and structured cabling infrastructure against thermal or liquid risk.

ZONE 05

SECURITY OPERATIONS (SOC)

Dedicated control facility supervising CCTV matrixing, access control, and visitor management.

MONITORED SYSTEMS

Access control controller heartbeat, perimeter intrusion alert flags, barrier status relays.

TYPICAL INTERFACES

Ethernet supervisory gateways, dry-contact alarm inputs, multi-monitor HMI terminals.

OPERATIONAL PURPOSE

Coordinate physical access alarms with broader facility emergency and entrance workflows.

ZONE 06

CRITICAL ROOMS

High-value archives, clean-agent suppression rooms, UPS battery banks, and medical labs.

MONITORED SYSTEMS

Clean-agent cylinder release flags, aspirating VESDA smoke alerts, battery room ventilation flow.

TYPICAL INTERFACES

Supervised relay modules, hydrogen sensor interfaces, gas discharge pressure switches.

OPERATIONAL PURPOSE

Provide immediate annunciation of critical room life-safety and environmental threshold breaches.

ZONE 07

PERIMETER / ACCESS POINTS

Pedestrian turnstile banks, vehicular barrier gates, and emergency exit egress routes.

MONITORED SYSTEMS

Barrier gate positions, optical turnstile cycle count, emergency break-glass activation state.

TYPICAL INTERFACES

Loop detector controllers, door position monitoring switches, supervised fire-unlock contacts.

OPERATIONAL PURPOSE

Supervise primary perimeter throughput and verify fail-safe emergency egress release status.

ZONE 08

COMMON / CIRCULATION CORRIDORS

Public lobbies, elevator vestibules, emergency stairwells, and egress passageways.

MONITORED SYSTEMS

Stairwell pressurization fan run state, emergency egress lighting relays, public address speaker lines.

TYPICAL INTERFACES

Stairwell differential pressure sensors, 100V line supervision modules, DALI lighting routers.

OPERATIONAL PURPOSE

Maintain safe egress conditions during fire alarm activation and normal daily transit.

SECTION 08 • SIGNAL FLOW TAXONOMY

FROM FIELD DEVICE TO FACILITY VISIBILITY

Seven-tier engineering hierarchy linking physical transducer voltages to central facility operations.
LEVEL 01TIER

FIELD DEVICE

Physical instruments converting atmospheric or mechanical states into analog signals.

KEY COMPONENTS
  • Temperature Sensors
  • Differential Pressure
  • Water Leak Cables
  • Dry Contact Switches
LEVEL 02TIER

TERMINATION / IO

Structured DIN-rail marshalling cabinets isolating and organizing raw field wiring conductors.

KEY COMPONENTS
  • Terminal Blocks
  • Surge Suppressors
  • Analog Inputs (AI)
  • Digital Inputs (DI)
LEVEL 03TIER

DDC CONTROLLER

Distributed processing panels executing independent control loops and digitizing sensor metrics.

KEY COMPONENTS
  • Microprocessor Core
  • Local Control Logic
  • Non-Volatile Flash
  • PID Loop Algorithms
LEVEL 04TIER

FIELD BUS

Serial or token-passing networks interconnecting distributed automation panels.

KEY COMPONENTS
  • BACnet MS/TP (RS-485)
  • Modbus RTU
  • Daisy-Chain Topology
  • Shielded Twisted Pair
LEVEL 05TIER

GATEWAY / IP

High-speed routing hardware bridging serial controller field buses into the campus network core.

KEY COMPONENTS
  • Protocol Conversion
  • BACnet/IP Gateway
  • Modbus TCP/IP
  • Ethernet VLAN Isolation
LEVEL 06TIER

SUPERVISORY SERVER

Central host server running supervisory engine, real-time polling, and trend logging.

KEY COMPONENTS
  • BMS Core Software
  • Historical Database
  • Alarm Priority Engine
  • ODBC/SQL Data Sync
LEVEL 07TIER

OPERATOR WORKSTATION

High-resolution operator HMI consoles providing visual control and rapid diagnostic insight.

KEY COMPONENTS
  • Dynamic Floor Plans
  • Equipment Schematics
  • Alarm Annunciator
  • Audit Trail Reports
SECTION 09 • CAUSE & EFFECT EXAMPLES

INTEGRATION INTELLIGENCE RECORDS

PROJECT-SPECIFIC REPRESENTATIVE EXAMPLES

Actual cause-and-effect sequences, interlock logic, and emergency responses are governed strictly by the approved project design, mechanical fire-safety matrices, and statutory municipal codes. The sequences below represent common integration methodologies.

LOGIC-01LIFE-SAFETY MANDATED

FIRE ALARM & HVAC INTERFACE SEQUENCE

Supervised coordination between main Fire Alarm Control Panel (FACP) and air-handling subsystems during confirmed fire alarm events.

REPRESENTATIVE EVENT SEQUENCE
1.Addressable smoke sensor triggers verified alarm state on FACP.
2.FACP energizes dedicated fire trip relay to BMS DDC controller.
3.BMS executes pre-programmed AHU supply/exhaust fan shutdown sequence.
4.Motorized smoke/fire dampers spring-return to closed fail-safe position.
5.Supervisory console updates visual floor plan with flashing red zone status and logs timestamp.
QUALIFICATION:Execution is governed strictly by the approved FACP cause-and-effect matrix; BMS provides auxiliary confirmation and monitoring.
LOGIC-02FACILITY ASSET PROTECTION

CRITICAL ROOM WATER LEAK DETECTION SEQUENCE

Fast-response liquid breach notification in raised-floor server rooms, telecommunication risers, and electrical panel environments.

REPRESENTATIVE EVENT SEQUENCE
1.Conductive liquid contacts sensing cable installed beneath raised flooring.
2.Localized change in loop resistance registers on Water Leak Detection (WLD) panel.
3.WLD alarm contact trips dedicated digital input on local BMS DDC controller.
4.Supervisory workstation sounds audible alert and presents exact distance/zone on floor plan.
5.Maintenance engineering roster receives automated SMS/email alert flag for emergency dispatch.
QUALIFICATION:Threshold sensitivity and zone notification pathways are calibrated to project-specific containment layouts.
LOGIC-03POWER CONTINUITY MONITORING

ELECTRICAL POWER ANOMALY & ATS SEQUENCE

Real-time telemetry tracking when main grid power experiences interruption, phase loss, or transfer to standby diesel generators.

REPRESENTATIVE EVENT SEQUENCE
1.Main LT breaker trip auxiliary contact changes state upon utility failure.
2.Automatic Transfer Switch (ATS) triggers generator start sequence.
3.Digital multi-function meter transmits zero-voltage telemetry over Modbus loop.
4.BMS marks main incoming supply as inactive and flags ATS on generator power.
5.Non-critical secondary lighting and comfort cooling circuits are shed where configured.
QUALIFICATION:Electrical switching and load shedding operations are dictated by electrical consultant engineering schedules.
LOGIC-04FACILITY SURVEILLANCE CORRELATION

SECURITY FORCED DOOR & ACCESS INTEGRATION

Cross-system correlation between physical access control door switches, CCTV cameras, and facility operations consoles.

REPRESENTATIVE EVENT SEQUENCE
1.Magnetic door position switch opens without a valid authorized credential read.
2.Access control door controller registers door-forced-open alarm flag.
3.Security management software transmits event flag to BMS supervisory platform.
4.Associated CCTV PTZ camera is automatically commanded to home preset on the breach doorway.
5.SOC workstation highlights the door on graphical map and queues live camera video feed.
QUALIFICATION:Camera matrix presets and access control alerts require verified IP network integration across subsystem controllers.
SECTION 10 • ENGINEERING DELIVERABLES

THE BUILDING IS DOCUMENTED AS A SYSTEM

Complete engineering documentation packages delivered as part of verified BMS integration.
DOC-01DELIVERABLE

INPUT / OUTPUT (I/O) SCHEDULE

Comprehensive registers enumerating every connected analog input, digital input, analog output, and digital output point.

STANDARD RECORD
DOC-02DELIVERABLE

POINT MAPPING REGISTER

Hardware and software cross-reference mapping field sensors to controller channel addresses and supervisory tags.

STANDARD RECORD
DOC-03DELIVERABLE

CONTROL SYSTEM SCHEMATICS

Architectural riser drawings illustrating controller communications, power feeds, panel locations, and backbone routing.

STANDARD RECORD
DOC-04DELIVERABLE

PANEL GENERAL ARRANGEMENTS (GA)

Detailed dimensional layouts of DDC enclosure internal DIN-rail components, power supplies, and field terminal strips.

STANDARD RECORD
DOC-05DELIVERABLE

TERMINAL WIRING DIAGRAMS

Point-to-point conductor schematics indicating terminal block numbers, cable wire codes, and surge protection terminations.

STANDARD RECORD
DOC-06DELIVERABLE

INTERFACE CONTROL MATRICES

Explicit boundary registers defining electrical, mechanical, and fire-alarm demarcation points across third-party equipment.

STANDARD RECORD
DOC-07DELIVERABLE

CAUSE & EFFECT LOGIC SHEETS

Documented behavioral matrices recording interlock actions, alarm priorities, fan shutdowns, and automatic responses.

STANDARD RECORD
DOC-08DELIVERABLE

NETWORK ADDRESSING SCHEDULE

Systematic register of MAC addresses, BACnet device IDs, IP addresses, subnet masks, and VLAN IDs for all controllers.

STANDARD RECORD
DOC-09DELIVERABLE

SYSTEM INTEGRATION MANUALS

Operator reference documentation providing user guides for the graphical HMI, alarm acknowledgments, and trending tools.

STANDARD RECORD
DOC-10DELIVERABLE

TESTING & COMMISSIONING REPORTS

Signed end-to-end point verification checklists, loop calibration certificates, and multi-system failover test logs.

STANDARD RECORD
DOC-11DELIVERABLE

AS-BUILT SCHEMATIC DRAWINGS

Final certified AutoCAD drawings reflecting exact as-installed cable pathways, sensor coordinates, and panel placements.

STANDARD RECORD
DOC-12DELIVERABLE

PREVENTATIVE MAINTENANCE AUDITS

Structured service guidelines, sensor recalibration timetables, software backup procedures, and controller health checklists.

STANDARD RECORD
SECTION 11 • ARCHIVAL REPOSITORY STATUS

VERIFIED BMS / AUTOMATION PROJECT RECORDS

ZERO FABRICATED RECORDS
GOVERNANCE STATUS: CONTROLLED DISCIPLINE ARCHIVE

COMMERCIAL & INSTITUTIONAL ARCHIVE DOSSIERS RESTRICTED

Hornet Infotech enforces a strict data integrity policy across its public web repositories. In accordance with enterprise non-disclosure agreements (NDAs) and institutional facility security protocols, verified Building Management Systems (BMS) and automation project dossiers are released only following formal client declassification and engineering audit.

INTERNAL REPOSITORY:ALL_PROJECTS = []
PUBLIC PROJECT COUNT:0 DOCUMENTS DISPLAYED
CLIENT NON-DISCLOSURE COMPLIANCE:100% ENFORCED

Organizations requiring verified reference architectures, credentialed past performance, or project-specific capability statements may request credentialed documentation through our technical consultation desk.

SECTION 12 • TECHNICAL SPECIFICATION FRAMEWORK

ARCHIVAL BASELINE METADATA

Engineering parameters governing field deployment and automation architecture.

COMMUNICATION STANDARDS

Open ProtocolsBACnet/IP, BACnet MS/TP
Industrial Field BusModbus RTU, Modbus TCP/IP
Lighting InterfacesDALI-2, 0-10V Analog
Auxiliary GatewaysSNMP, OPC UA, MQTT

HARDWARE & PANELS

Panel RatingIP54 / IP55 Powder-Coated Steel
Controller Type32-Bit Microprocessor DDC
Power Supply24V AC / 24V DC Regulated
Terminal BlocksDIN-Rail Spring-Clamp / Screw

TRANSDUCERS & SENSORS

TemperaturePT1000 / NTC 10k Type II/III
Humidity0-10V / 4-20mA (±2% RH)
Differential PressurePiezoresistive Air/Water
Liquid DetectionPolymer Sensing Cable

GOVERNANCE & AUDIT

Event LoggingChronological Historical Buffer
Alarm PriorityMulti-Tier Critical / Warning
Security Role AccessOperator / Engineer / Admin
As-Built PackageSingle Lines, Schedules & O&M
SECTION 15 • ARCHIVE GOVERNANCE

CONTROLLED PUBLICATION PIPELINE

Four-stage vetting lifecycle ensuring 100% compliance with security non-disclosure obligations.
01

PROJECT DOCUMENTATION

Compilation of signed commissioning certificates, single-line schematics, and equipment registers upon operational handover.

VERIFIED PROTOCOL
02

TECHNICAL VERIFICATION

Internal engineering audit verifying as-built accuracy, interface boundaries, and subsystem scope demarcation.

VERIFIED PROTOCOL
03

CLIENT CLEARANCE

Formal client security review and redaction of sensitive identifiers, asset tags, and proprietary network addresses.

VERIFIED PROTOCOL
04

PUBLIC ARCHIVE ENTRY

Release of declassified dossier into the public Hornet Infotech Project Archive with permanent archival indexing.

VERIFIED PROTOCOL
CONSULTATION • BMS & AUTOMATION ARCHITECTURE

REQUEST TECHNICAL CONSULTATION

Engage Hornet Infotech engineering specialists for technical review, system architecture, point schedule definition, or integration specifications for your facility.

REGIONAL HEADQUARTERS
HORNET INFOTECH
J-50, Abul Fazal Enclave, Okhla, New Delhi-110025
Pan-India Execution
STANDARD BUSINESS HOURS: 09:30 — 18:30 IST
EMERGENCY AMC SUPPORT: 24 / 7 / 365 CONTRACTUAL